2003 TTHM - 4th quarter
(Total Trihalomethanes)

Our TTHM testing is done quarterly, and there are two sets of tests, one for each treatment plant. Our treatment plants are listed as "entry points". The newer plant, on McKinley Avenue, is EP#1, and the older plant on East Washington Street is EP#2. TTHM testing is done at points of maximum residence time in the system. Each of the two points have been selected to represent one of the two treatment plants.

The maximum allowable limit on Total Trihalomethanes is now 80 ug/l. (ug/l = Micrograms) Total Trihalomethanes are associated with the disinfection process, and are attributable to the addition of Chlorine to the water system. Reactions between the Chlorine and elements within the water, produce Trihalomethane compounds.

The analysis of these tests was done by Environmental Labs, Inc. of Madison, Indiana.


Total Trihalomethanes - East Plant - test collected at 755 E.Boone St.
Test Test DateResult in Miligrams per liter (mg/l)
Detection Limit
Bromodichloromethane
10/27/2003
3.5 ug/l
.5 ug/l
Bromoform
10/27/2003
<.0005
.5 ug/l
Chlorodibromomethane
10/27/2003
1.3 ug/l
.5 ug/l
Chloroform
10/27/2003
5.0 ug/l
.5 ug/l
Total Trihalomethanes
10/27/2003
9.7 ug/l
MAX Allowable 80 ug/l

Total Trihalomethanes - West Plant - test collected at Wastewater Treatment Plant lab sink
Test Test DateResult in Micrograms per liter (ug/l)
Detection Limit
Bromodichloromethane
10/27/2003
9.6 ug/l
.5 ug/l
Bromoform
10/27/2003
<.0005
.5 ug/l
Chlorodibromomethane
10/27/2003
1.8 ug/l
.5 ug/l
Chloroform
10/27/2003
26.9 ug/l
.5 ug/l
Total Trihalomethanes
10/27/2003
38.3 ug/l
MAX Allowable 80 ug/l